Search for:
  • Home/
  • Environment/
  • Shenzhen Environmental Water Affairs Group builds a "safety network" inspection pipeline for 1805 kilometers

Shenzhen Environmental Water Affairs Group builds a "safety network" inspection pipeline for 1805 kilometers

  Affected by the movement of the heavy rain and cloud group eastward, Shenzhen Meteorological Observatory upgraded Luohu District, Yantian District, Longgang District, Pingshan District, Dapeng New District, Dapeng Bay and Da Ya Bay heavy rain yellow warning signal on April 21, upgraded to orange.The city enters the state of heavy rain defense.In order to do a good job of rain and drainage and waterlogging in this round, Shenzhen Environmental Water Affairs Group attaches great importance to and actively carry out relevant work.

  It is reported that the Shenzhen Environmental Water Affairs Group held a meeting before the flood season, deployed the recent heavy rainfall defense work, implemented the requirements for flood prevention plans at high standards, learned lessons, overcome the paralysis ideas, strengthened the preparations for duty and rescue and rescue, strictly implemented information reporting to send information reporting to send information reporting to send information.Regulation.

  At the same time, keep an eye on key points and strengthen management.In terms of drainage facilities, various regional molecules of the main force strengthen the rainwater pipe canal clearing to ensure the smooth operation of the drainage system.Strengthen the coordinated linkage of the plant network network to further strengthen the management and control of low liquid levels of drainage pipe networks, and strengthen the joint scheduling with the watershed center in the rain.In terms of waterlogging points in the water, in accordance with the requirements of “one point, one point, a special class, one -point equipment”, do a good job of guarding the work, implement safety control measures, establish joint prevention and control work mechanisms with the property, and focus on underground storms.And stagnant emergency schedule.In terms of water construction projects, we will do a good job in the management of wading projects in advance to prevent personnel from staying and do a good job of soil and water conservation.In terms of rivers and small reservoirs, the inspections of river channels have been increased, the number of inspections and frequency is increased, and the personnel around the river have been evacuated in time during the rainstorm. At the same time, strictly implement the “three responsible persons” of the risk prevention and control of the reservoir to ensure that the rescue security measures are in place.

  In order to strengthen control and ensure production, the main person in charge of the factory station strictly fulfilled the responsibilities of the first responsible person, carried out risks and weak points in advance, strengthened the management process and equipment management of drainage production, strictly implemented water supply and dispatching requirements, strengthened emergency rescue, sufficientRepair materials provide strong and powerful organizational guarantees for drainage production safety.